Shell construction
The shell is the foundation of a building’s quality. Concrete and steel that go in wrong cannot be put right afterwards except at enormous cost.
What you receive
By cube testing at an accredited laboratory at 7 and 28 days. You should receive a copy of the result for every pour — that is a basic requirement, not a luxury.
It depends on the number of floors, the spans, the foundation system and the price of steel and cement at the time. Which is why any price quoted without drawings is a guess.
One contract from design to finishing — a clear schedule and a single point of responsibility.
Structural design and calculations to the Egyptian code, with complete construction drawings.
Design, supply and erection of steel hangars and structures for factories and warehouses.
Expected timeline
4 to 8 months