Shell construction
The shell is the foundation of a building’s quality. Concrete and steel that go in wrong cannot be put right afterwards except at enormous cost.
What you receive
Expected timeline
4 to 8 months
By cube testing at an accredited laboratory at 7 and 28 days. You should receive a copy of the result for every pour — that is a basic requirement, not a luxury.
It depends on the number of floors, the spans, the foundation system and the price of steel and cement at the time. Which is why any price quoted without drawings is a guess.
ResidentialFifth Settlement, New Cairo
CommercialEl-Bahr Street, El-Mahalla El-Kubra
AdministrativeCity centre, Tanta
One contract from design to finishing — a clear schedule and a single point of responsibility.
Structural design and calculations to the Egyptian code, with complete construction drawings.
Design, supply and erection of steel hangars and structures for factories and warehouses.