Paperwork in order
A permit is not one piece of paper, it is a complete file. Any missing document sends the file back to the start and costs months.
What you receive
Expected timeline
One to three months depending on the district and how complete the paperwork is. The commonest cause of delay is missing ownership documents.
No. Building without a permit exposes you to a stop-work order, fines and demolition.
One contract from design to finishing — a clear schedule and a single point of responsibility.
Structural design and calculations to the Egyptian code, with complete construction drawings.
Concrete frame and blockwork with engineering supervision and material testing.
1 to 3 months