
Hangars and factories
Steel structures go up faster than concrete and give wider spans with no intermediate columns — which is why factories and warehouses prefer them.
What you receive
Over wide spans, usually yes — and it goes up faster. For multi-storey buildings concrete is generally the more economical choice.
By hot-dip galvanising or an epoxy paint system. The choice depends on the surrounding environment and what the factory produces.
One contract from design to finishing — a clear schedule and a single point of responsibility.
Structural design and calculations to the Egyptian code, with complete construction drawings.
Concrete frame and blockwork with engineering supervision and material testing.
Expected timeline
3 to 6 months