
Certified calculations
The structural design decides both the safety of the building and its cost. A good design saves steel and concrete without touching the safety margin.
What you receive
Any building over two storeys needs one. The report determines the foundation type and saves a great deal of money by stopping you over-designing.
Two to four weeks for an ordinary villa. Larger buildings or special structures can take up to six weeks.
One contract from design to finishing — a clear schedule and a single point of responsibility.
Concrete frame and blockwork with engineering supervision and material testing.
Design, supply and erection of steel hangars and structures for factories and warehouses.
Expected timeline
2 to 6 weeks