Complete finishing
Finishing is the part the client sees and lives in. Written specifications and samples approved before work begins prevent ninety per cent of disputes.
What you receive
It varies with the finishing level and the materials. What matters more is getting a written specification booklet, because the same price can produce two completely different results.
Yes, and we insist on it. Every major material is approved with a signed sample before it is delivered.
One contract from design to finishing — a clear schedule and a single point of responsibility.
Structural design and calculations to the Egyptian code, with complete construction drawings.
Concrete frame and blockwork with engineering supervision and material testing.
Expected timeline
3 to 6 months for an apartment