
Your eyes on site
If you already have a contractor building for you, engineering supervision protects you from mistakes and from inflated invoices — and saves several times what it costs.
What you receive
Expected timeline
For the duration of the project
Yes. Reviewing the invoices alone uncovers quantity discrepancies that cover the cost of the supervision — quite apart from preventing mistakes that cost several times as much to put right.
Twice a week normally, and daily during the critical concrete pours.
One contract from design to finishing — a clear schedule and a single point of responsibility.
Structural design and calculations to the Egyptian code, with complete construction drawings.
Concrete frame and blockwork with engineering supervision and material testing.