From bare land to the keys
Turnkey means you hand us the land and receive a house ready to live in. One contract, one person accountable, and a written schedule from the first design to the final coat of paint.
What you receive
With turnkey you agree one total price against a fixed specification, and the contractor carries responsibility for everything. With a bill of quantities you pay per item at its measured quantity, and the final cost only becomes clear as the work ends.
In instalments tied to construction stages: one on signing, then at foundations, frame, blockwork and finishing, with the last on handover.

Comparisons1 min read3 August 2026
The difference is not only in the price, it is in who carries the risk. This guide sets out when each arrangement suits you better.
Read the article
Costs1 min read18 July 2026
Structural design and calculations to the Egyptian code, with complete construction drawings.
Concrete frame and blockwork with engineering supervision and material testing.
Design, supply and erection of steel hangars and structures for factories and warehouses.
Expected timeline
8 to 14 months for a mid-sized villa
Yes, but every change is written up as a change order stating the cost and time difference before it is carried out, so there is no disagreement later.
The cost of building a villa in Egypt in 2026 varies with the foundation system and the finishing level. This guide breaks every line item down by figure and by percentage.