Turnkey or a bill of quantities? The real difference
The difference is not only in the price, it is in who carries the risk. This guide sets out when each arrangement suits you better.
Eng. Ahmed El-Shennawy
Structural engineer · NSCO Construction

Under a turnkey contract the contractor carries the risk on quantities and prices. Under a bill of quantities you carry it yourself. That is the essential difference; everything else is detail.
The two arrangements side by side
| Criterion | Turnkey | Bill of quantities |
|---|---|---|
| Final price | Known from the start | Emerges as the work ends |
| Quantity risk | On the contractor | On the owner |
| Flexibility to change | Limited | Higher |
| Supervision needed | Less | Heavy |
When should you choose turnkey?
- When you cannot follow the work day to day
- When you want the final cost known from the outset
- When you are travelling, or far from the site
Frequently asked questions on this topic
01Is turnkey more expensive?
On the face of it it can be, because the contractor prices the quantity risk. But a bill of quantities usually ends up costing more than expected once the quantities grow.
02Can I change the specification during construction?
Yes, with a written change order stating the cost and time difference before the work begins.
Got a plot and want a real number for your project?
Send us the area, the location and the finishing level you have in mind, and we will come back with a preliminary offer within 48 hours.
Related articles

Comparisons1 min read16 August 2026
A steel hangar or a concrete one for your factory?
The difference is not only price — it is build time, clear spans and how easily you extend later. A practical comparison before you decide.
Read the article
Comparisons1 min read27 July 2026
Piles or a raft? How to choose your building’s foundation
The choice between piles and a raft depends on the borehole report and the building loads — not on the contractor’s opinion. Here is the difference in full.
Read the article